Verify evidence Search

Engagement process

Eight steps from scope to publication.

Every VPN Labs engagement runs through the same eight steps: enquiry and scoping, written authorisation and rules of engagement, the testing window, evidence capture and hashing, peer review, vendor notification and remediation window, retest, and publication with right of reply. Testing never starts before authorisation is signed, and the vendor sees the findings before the public does.

  • Service terms v1.0
  • Updated
Illustration of the audit engagement process from scoping to publication
Steps
8, always in the same order
Testing gate
Written authorisation signed first
Evidence
SHA-256 hash at capture
Review
Second assessor not involved in testing
Vendor
Notified before publication
Changes
New version, dated history entry
Timeline

The eight steps.

Each step has a defined output and a gate that must be passed before the next step begins. Steps are never skipped to meet a deadline.

  1. Step 1

    Enquiry & scoping

    You describe the product, platforms, versions and the question to be answered. We recommend a tier, define what is in and out of scope, run a conflict-of-interest check and send a fixed-fee proposal.

    Activities

    • Tier recommendation based on the question the engagement must answer
    • In-scope and out-of-scope lists with platforms and exact versions
    • Conflict-of-interest check, including any ownership or operating relationship with the brand
    • Fixed fee agreed in writing, independent of the outcome
    Output
    Scope document and written fee agreement
    Gate
    Tier, scope and fee agreed in writing; conflicts declared or the engagement declined.
  2. Step 2

    Written authorisation & rules of engagement

    Before any testing beyond normal customer use, the party entitled to authorise it signs a written authorisation naming the systems, versions, accounts and test window. Rules of engagement set out what is not allowed and how testing is stopped in an emergency.

    Activities

    • Signed authorisation from the vendor or the system operator
    • Rules of engagement: prohibited actions, rate limits, data handling
    • Named technical and emergency contacts and an agreed stop procedure
    • Publication terms confirmed in writing
    Output
    Signed authorisation and rules of engagement
    Gate
    No authorised testing starts before the authorisation is signed.
  3. Step 3

    Testing window

    Testing takes place within the agreed dates on lab devices with recorded configurations and tool versions. Issues that put users at immediate risk are reported to the vendor straight away rather than held back for the report.

    Activities

    • Clean, documented test devices; operating-system builds and tool versions recorded
    • Repeated runs for every measured behaviour
    • All activity inside the written scope and window; deviations logged
    • Urgent issues escalated immediately to the security contact
    Output
    Raw test data and working notes
    Gate
    Testing stays inside the written scope and the agreed window.
  4. Step 4

    Evidence capture & hashing

    Packet captures, logs, screenshots and configuration files are hashed with SHA-256 when they are captured and listed in an evidence manifest. Files that must be withheld keep a published hash, so they can be verified if they are released later.

    Activities

    • SHA-256 hash computed at capture time
    • Evidence manifest with capture time, kind, access level and size
    • Redaction of personal data and lab infrastructure addresses before publication
    • Access levels: public, restricted, or withheld with the hash published
    Output
    Evidence manifest with a SHA-256 hash per file
    Gate
    Every reported finding references at least one evidence item.

    Evidence-handling methodology

  5. Step 5

    Peer review

    A second assessor who was not involved in the testing reviews every finding: is it reproducible, are the severity and the CVSS v4.0 vector justified, and does the wording stay within the evidence and the scope?

    Activities

    • Reproduction of each finding from the evidence and notes
    • Review of severity, CVSS v4.0 vector and score
    • Check that every claim in the text is backed by evidence
    • Check of scope, labels and conflicts statement
    Output
    Peer-reviewed draft
    Gate
    Findings that cannot be reproduced are recorded internally as “not confirmed” and are not published.
  6. Step 6

    Vendor notification & remediation window

    The vendor receives the findings before anyone else, through its security contact. It can check facts, fix issues within the remediation window of the disclosure policy and submit a statement for publication. It cannot approve, edit or veto findings.

    Activities

    • Findings sent to the security contact; notification date recorded
    • Factual-accuracy check by the vendor
    • The vendor normally has 90 days from notification to fix the issue; one extension of up to 30 days can be granted on request. The same deadlines apply to every vendor (see the disclosure policy).
    • Vendor statement requested for publication
    Output
    Dated notification and the vendor’s response
    Gate
    Proof-of-concept code is never published; detailed reproduction steps no earlier than 30 days after a fix is available.

    Coordinated vulnerability disclosure policy

  7. Step 7

    Retest

    When fixes ship, the original test procedure is repeated against the fixed version. The retest result for each finding — date, version tested and outcome — is added to the record.

    Activities

    • Same procedure, same environment, fixed version
    • Outcome per finding: resolved, partially resolved or not resolved
    • Finding status updated only after a successful retest
    • New record version with a dated history entry
    Output
    Retest result per finding
    Gate
    A finding is marked fixed only after a successful retest.
  8. Step 8

    Publication & right of reply

    The record is published with a permanent report ID, a version number, its engagement label and the vendor’s statement. Later changes — retests, corrections, replies — are added as new versions with dated history entries; nothing is changed silently.

    Activities

    • Permanent report ID in the format VPNL-YYYY-NNNN
    • Engagement label, scope and conflicts statement on the record
    • Vendor statement published alongside the findings
    • Right of reply and corrections handled as new, dated versions
    Output
    Public record with version history
    Gate
    Labels, scope and conflicts statement present before publication.

    Right of reply

By tier

How the steps apply to each tier.

All three tiers follow the same sequence. Where a step is adapted or optional for a tier, the note says how.

Engagement steps by service tier (Applies / Adapted / Optional)
StepVPN Technical AssessmentVPN Security AuditIndependent Verification
Enquiry & scoping AppliesAppliesAppliesEach claim recorded verbatim with its source
Written authorisation & rules of engagement AdaptedEngagement letter when commissioned; no intrusive testingAppliesAdaptedRequired for claims about servers or internals
Testing window AppliesAppliesAppliesProcedure fixed before testing starts
Evidence capture & hashing AppliesAppliesApplies
Peer review AppliesAppliesApplies
Vendor notification & remediation window AdaptedFactual-accuracy check; any vulnerability follows the disclosure policyAppliesAdaptedVendor and claimant both receive the result first
Retest OptionalRe-assessment of a later version on requestAppliesOne retest round includedOptionalRe-verification of a later version on request
Publication & right of reply AppliesAppliesApplies
Roles

Who does what.

The roles involved in every engagement. Each record states who held the lead and review roles; the commissioning party never holds either.

  • Lead assessor

    Plans and performs the testing, writes the findings and maintains the evidence manifest.

  • Second assessor

    Reviews every finding before notification. Is not involved in the testing and signs off severity and wording.

  • Independent reviewer

    Assigned in the sensitive cases of Independence Policy § 6.5: an ownership or operating relationship with the tested brand, a declared conflict of the Head of Research, a finding rated Critical, a vendor dispute the original assessor cannot resolve, and every proposed retraction. Sits outside the engagement.

  • Commissioning party

    Requests the engagement and agrees scope and fee. Named on the record; has no say over findings.

  • Vendor security contact

    Receives findings first, coordinates fixes and the retest, and may submit a statement for publication.

Team and roles

Illustration of a small research team reviewing findings together

Next step

Start at step one.

Send an enquiry with the product, platforms and the question you need answered. Scoping and the fixed-fee proposal come before any commitment.

Or write to support@vpn.com.de — no testing starts before scope, fee and authorisation are agreed in writing.